Hello experts,
i have the following szenario:
SAP ERP 6.0 on
Windows 2003 / MS SQL Server 2005
Central system (central instanz and db instanz on one host) and one dialog instance.
The export on my central system takes a long time, because the DB and the R3Load processes share 4 CPUs.
Is it possible to start the SWPM (SAPInst) on the application server / dialog instanz? (due to performance)
When i try to start the SAPInst on my DI, first it works fine. It collects the profiles, find the DB, and so forth.
But the SAPInst dont ask for some export parameters (e.g. Load Jobs, ..) and the task finished with an empty export directory.
regards
Benjamin