We plan to update to NW 7.4 from EHP1 for NW 7.3. We are currently at Windows 2008 R2 SP2. I know SUM checks phase will tell me if i need to be on a higher SP level for Database however is there any way I can pre-empt that. I cannot find this information in PAM as it just lists the baseline SQL Server R2 SP2 being supported for SAP NW 7.4. All I want to pre-empt is would upgrade to 7.4 warrant a higher DB support package level on SQL Server R2 SP2.
Regards
Kalyan