Hello All,
While upgrading the Solution Manager to Ehp1, import stuck at phase DDIC_ACTIVATION, reason for error is TP_STEP_FAILURE, the return code is 0012 and the error message: OCS Package ******** , tp step A, return code 0012.
I can see in the log of the import queue that the job RDDMASGL was terminated and I found the entry "ABAP / 4 processor: EXSORT_NOT_ENOUGH_MEMORY" in the log of that job.
My system is a 32 bit Windows operation system with 3GB physical Ram.
I have the following doubt
1.) If i keep on re-runing again will the already activated program will be skip or will be re-activated.
2.)How can i resolve this error.
Regards
Anthony