Hello all,
I need some advice about upgrade with SUM Tool,
I had for 7 week ago start SUM tool to upgrade SAP ABAP installation
and I was finished with Check Phase on that time. The system is on frozen zone.
My question is can I continue with this upgrade after so long and go to
preprocessing phase. Or I should reset the upgrade and start with a new SUM
from scratch.
Thanks
Reza