Dear experts,
We have upgraded our BW System NetWeaver70 to EhP1 7.01.
Our current state is as follows:
SAP_BASIS 701 SP 05
SAP_ABA 701 SP 05
PI_BASIS 701 SP 05
SAP_BW 701 SP 05
SAP_BS_FND SP 04
FINBASIS 603
SEM_BW 603
Symptom:
We want to upgrade the SAP ERP components FINBASIS 603 and SEM-BW 603
to 604 into BW.
-rw-rr 1 c2badm sapsys 62844693 2009-11-09 14:20 K-
604BGINFINBASIS.SAR
FINBASIS 604: Add-On Upgrade
-rw-rr 1 c2badm sapsys 83012258 2009-11-09 14:22 K-
604BGINSEMBW.SAR
SEM-BW 604: Add-On Upgrade
the files was extracted to EPS/in
Problem:
We are not able to upgrade this SP's with SAINT. We get the following
SAINT-info:
"This Enhancement Package Inst. must be configured by Stack XML"
We are also not able to get the corresponding XML file from the
Solution Manager (7.01 SPS 03)!
Is there any possibility to get our FINBASIS 603 and SEM-BW 603 up to
604 AFTER EhP1-Upgrade is finished??
Thank you in advance !