Quantcast
Channel: SCN : All Content - SAP NetWeaver Administrator
Viewing all articles
Browse latest Browse all 5139

Run ASU toolbox during ECC6 EHP7 upgrade

$
0
0


Hi,

 

Why ASU toolbox message comes during the upgrade ? Can I bypass it ? Can I do the step at the end of the upgrade ? What is the importance of running ASU during the upgrade ? We must run it if not the upgrade will fail.

 

I have seen the command /n/ASU/Start or /n/ASU/upgrade. When I created it shows lots of OSS Notes under manual preparation. Do I have to apply them all ? How long is the process for ASU ? What option should I pick "start fully automated preparation steps "   " Start fully automated follow-up steps"  What is the pros and cons to run the ASU when the message pops up or after the upgrade. I have seen OSS Note 1000009.

 

How come it will not pop up when I was doing my sandbox upgrade but it pops up during my Dev upgrade.

 

Please let me know the details and consequences if I missed that steps and continue my upgrade.

 

Thanks

Mohammad Farooq


Viewing all articles
Browse latest Browse all 5139

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>