EHP7 Upgrade - NZDM (Near Zero Down Time) has anyone upgrade with this option

$
0
0

Hi

 

I would like to know if anyone has an experience to upgrade by using SUM and using the ZDM option.

 

I am doing my QA system upgrade to EHP4 to EHP7 / Windows 2008/SQL env. I have never used this option before. I would like to know how it's going to use. Do I have to manually bring down the shadow instance ? Currently, I am stuck in a execution phase and it's not moving further.

I started a /nCRR_Control process manually. Now there are no tables in the server list but it still running. It's been running since past 3 days.

It says " The replication of recorded changes is currently active"

 

 

"More than 95% of recorded changes are transferred. You can start the downtime now or at a later point in time depending on your schedule. Keep monitoring the transfer until the start of the downtime."

 

 

1) I would like to know how long Do I need to wait?

2) Why I can't move the phase further ?

3) What needs to be done in order to complete the upgrade.

 

4) The following background job is still active since Thursday

RSUPG_ISU_CRR

DDIC          Active   01.11.2014 00:37:06         216.3692) since I have

manually started the T-code /nCRR_CONTROL data transfer

 

5) Do I need to stop the data transfer process or in other word to stop

the /nCRR_Control it shows the message below:

 

 

6) Do I need to cancel this job and stop /nCRR_Control transaction.

then restart the instance and start the Execution Phase . I have done

that and it failed.

 

I need to know what will be the next step ? how should I proceed.

 

My SUM is SUM10 SP11

 

 

Currently I am stuck in Execution Phase both Original and Shadow instances are up.

 

I am getting these errors:

CRRLAST.LOG

1EETQ399 Last error code set is: Single errors (code <= 8) found in logfile 'RSCRRLST.ELG'

1EETQ203 Upgrade phase "RUN_CRR_LAST" aborted with errors ("20141103153058")

 

***********

RSCRRLST.ELG

 

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Final data transfer of change recording framework ERRORS and RETURN CODE in RSCRRLST.DV2

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

A4 ESCRR 304 Start time.....: "03.11.2014" "15:30:29"

A4 ESCRR 002 " "

A4 ESCRR 001 -------------------------------------------------------------------------

A4 ESCRR_ISU 005 Action "LAST" started at "15:30:28"("03.11.2014")

A4 ESCRR_ISU 010 Number of used dialog processes set to "10"

A2EESCRR 064 No tasks exist for transition "LAST_TRANSFER" and scenario "ISU"

 

*******************

SAPupConsole.log

 

Severe error(s) occurred in phase

MAIN_SWITCH/SUBMOD_SWITCH_OLDREL/SUBMOD_CRR_LAST_CHTRANS/RUN_CRR_LAST!

 

 

Last error code set: RFC login to system DV2 ashost jls-sapdecc02 nr 01 gwhost

jls-sapdecc02 gwservice sapgw01 failed with code 1 key

RFC_COMMUNICATION_FAILURE: <br/> LOCATION CPIC (TCP/IP) on local host with

Unicode<br/> ERROR partner '172.20.20.128:3301' not reached<br/> TIME Mon Nov

03 15:26:47 2014<br/> RELEASE 721<br/> COMPONENT NI (network interface)<br/>

VERSION 40<br/> RC -10<br/> MODULE nixxi.cpp<br/> LINE 3283<br/> DETAIL

NiPConnect2: 172.20.20.128:3301<br/> SYSTEM CALL connect<br/> ERRNO 10061<br/>

ERRNO TEXT WSAECONNREFUSED: Connection refused<br/> COUNTER 4<br/>

 

 

A trouble ticket and an archive with all relevant log files have been
generated.
Trouble ticket: "E:\usr\sap\SUM\SUM\abap\log\SAPup_troubleticket.log"
Log archive: "E:\usr\sap\SUM\SUM\abap\log\SAPup_troubleticket_logs.sar"

01)  *  Repeat phase MAIN_SWITCH/SUBMOD_SWITCH_OLDREL/SUBMOD_CRR_LAST_CHTRANS/RUN_CRR_LAST to continue at the point it stopped
02)  -  Exit program
: Repeat phase MAIN_SWITCH/SUBMOD_SWITCH_OLDREL/SUBMOD_CRR_LAST_CHTRANS/RUN_CRR_LAST to continue at the point it stopped

Initialize phase MAIN_SWITCH/SUBMOD_SWITCH_OLDREL/SUBMOD_CRR_LAST_CHTRANS/RUN_CRR_LAST to restart it from the beginning
01)     INIT

Enter a number/range/"all" to change selection or "ok" to end:


>> 2014/11/03 15:29:27  START OF PHASE MAIN_SWITCH/SUBMOD_SWITCH_OLDREL/SUBMOD_CRR_LAST_CHTRANS/RUN_CRR_LAST

Starting of Final data transfer of change recording framework in batch (job RSUPG_ISU_CRR)

<< 2014/11/03 15:30:58  END OF PHASE   MAIN_SWITCH/SUBMOD_SWITCH_OLDREL/SUBMOD_CRR_LAST_CHTRANS/RUN_CRR_LAST

 

*****************************

 

 

Any Help will be appreciated.

 

Regards,

Mohammad Farooq