Quantcast
Channel: SCN : All Content - SAP NetWeaver Administrator
Viewing all articles
Browse latest Browse all 5139

Only one transport instance complete when transporting to multiple clients

$
0
0

Hi everyone,

Sorry for the confusing subject line. We have multiple clients in DEV and QA, and we configured the transport system to distribute transports to all clients when a transport is released. For example, if a transport is released from DEV100, it will go to DEV120, DEV140 and so on. In our R3 system, we could multi select all instances of the transport and run the transport into all clients at the same time. Since we have been on ECC6 EHP7, only one of the instances will complete. All the other instances will return to the ready for import state (green square). Is that a due to a design change or is something else at play here? We are very new to ECC, so we are not sure if this is the new normal or not.


Viewing all articles
Browse latest Browse all 5139

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>