Hello All,
I am applying EHP3 for CRM system, CRM system is install on cluster server.
During Preprocessing Phase SUM had stop with:
Severe error(s) occurred in phase MAIN_INIT/RUN_RSPTBFIL_INIT!,
Last error code set: Batchjob 'RSPTBFIL' with id '12405200' aborted
I can see the shaow instance is not becuse of disp+work was stop.
I had added disp+work file ,
I hope some body has tried this issue,
Thanks
Reza