Hi,
In my project, we have 4 server's(DEV,QAS,PRE-PRD,PRD) in the landscape .Now we have requirement of aligning the TMS in below format.
Current landscape has 3 servers configured in regular format(3 system landscape) and now our requirement is to add extra Pre-prod server
to DEV in parallel to QAS.
Stms route should be configured from DEV server to QAS and Pre-Prod server connected in parallel and then to Production from QAS.
DEV-->QAS--->PRD.
|
Pre-Prod
Regards,
Rama