Quantcast
Channel: SCN : All Content - SAP NetWeaver Administrator
Viewing all articles
Browse latest Browse all 5139

EHP_INCLUSION error

$
0
0

Hello

 

I am trying to upgrade my ERP 6.0 system to EHP7 but SUM is stuck on PREP_EXTENSION/EHP_INCLUSION stage. It says;

3 ETN248 Component: "SAP_GWFND" rel. "740", Support Package level: "0" (component type "A")

3 ETN248 Component: "SAP_UI" rel. "740", Support Package level: "0" (component type "A")

2 ETN085X"Calculate pure CRT Queue" "for installed Add-ons" "and already applied Support Packages" " "

3 ETN112 The OCS Package Queue is empty

2 ETN085X"Adding Add-on Installation Queue" " " " " " " 2EETN403 Add on installation/upgrade not yet complete. CRTs are required

 

 

I generated my stack.xml from Solution Manager, I selected EHP7 SP7 as target stack and then downloaded addons and support packages according to SolMan. Also my SolMan is on SP12 and has latest CIM content.

 

I tried resetting SUM, generating new stack.xml, downloading everything again (which was 41 GB) but nothing changed. It always stuck at the same point.

 

I am providing you my logs, if you can help me I will be grateful.

 

My system is on Windows 2008 R2 server with SQL 2012 SP1 CU7. Before EHP upgrade I also upgraded my SAP_BASIS from SP5 to SP16. I am also using latest 7.21 EXT x64 UC kernel with tp & r3trans updates.

 

 

Best regards

 

Kaan


Viewing all articles
Browse latest Browse all 5139

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>