Hi experts,
we will do a database Migration.
Therefore we would like to do an intensive testing on our testing-system.
This means, we will do an intensive testing before Migration and also after it, and then comparing the results (e.g. answer time).
Is there a report in SAP, which is for this kind of testing?
So I mean a report which creates 1000s of data base records, updates them and also deletes them and gives me a detailed result about answer time and other effectivity characteristics.
Thank you in advance