Hi,
We are planning do to system copy for PI7.1 system from PRD to QUA. I am trying to find some SAP Notes for Post steps.
what are the major post steps to perform in system copy apart from Background job suspend , cut the RFC connection and configuration wizard,etc..
I have gone throug below notes, but still i need more information about the communication channel to de-active and how I can bring the step of QUA.
1299373 - Configuration Wizard: PI System Copy
1400543 - Configuration Wizard: PI Robustness
1309239 - Configuration Wizard: PI NetWeaver initial setup
Platform: SAP PI7.1
OS : AIX
Database : Oracle 11G
Appropriate information are really appreciate.....
Thanks,
BM