Hello Gurus
My client has a requirement to migrate their SAP PI 7.1 system to new hardware (Endian Change). Their SLD resides on the PI Production server
The host name will change as part of this migration
Now my question is :
- Is it advisable to migrate the SLD to the new host in advance or
- Will the Export/Import migrate the SLD as well
Can someone shed any light on the post steps or point me to any SLD post migration guide
Thanks
Arun Nair