Dear all,
Could you please help me to figure out why the disp+work.exe cannot start to achieve the phase "Start instance" during the installation process ?
When i display the traces files, i can see that the it is the no more work processes that cause the dispatcher shutdown.
I've tested the database connexion through r3trans -d, returning 0 errors.
I have tried many things :
increase virtual memory
maitain the hosts file
relaunch the installation
the situation is that the disp+work start for a few minutes then stop for unknown reason.
My configuration is :
Windows 7 x64 ultimate (i'm installing the SAP IDES ECC6 EHP4 directly in the localsystem, without virtual machine)
i7, 1000GB HDD
I have 12GB of RAM
Actually i'm under 20000 GB of virtual memory paging file (i've tried to increase it, even though set it to 150000 GB do not resolve the problem)
I've tried to add a parameter in the profile file (/sap/usr/SYS/profile/default.PFL) = PHYZ_MEMSIZE = 100%, in vain. (regarding this point, could you please confirm that it is the correct way to set the PHYZ_MEMSIZE parameter )
Thanks you for help.