Hi guys,

 

This is my scenario, did a backup of our Production system yesterday at 08:00 am. At 12:05 pm (noon) a junior consultant imported transports which should not have been imported as they are out of sequence.

 

I did a restore of the database and now in stms you do not see the transports in the import history at all as I have restored to the 08:00am backup.

 

However in the import queue for production the out of sequence transports still show as imported. I did not do OS restore as it is a clean newly installed system. I think the transport buffer contains these entries e.g.

 

   SID       System SID

 

 

                Selection for Import                    24.04.2015 09:42:18    (0) Successfully Completed

          100 Selection for Import                     15.07.2015 12:09:16    (0) Successfully Completed

          100 Import                                        15.07.2015 12:09:57    (0) Successfully Completed

              Check Versions                            15.07.2015 12:10:00    (0) Successfully Completed

       Import steps not specific to transport request

 

According to me the changes made with imported transports is reverted with the database restore which precedes the import time.

However the OS buffer still reflects these as imported how do I delete these add them in same sequence to show as not imported yet?

 