We have a 11+1 hana SP's9 system with a system replication 11+1.
we plan to do a system copy on the primary:
1) shut down replication system (db + sap)
2) do the system copy to primary
3) start replication system db +sap.
Our hope is that step 3 will kick off a entire DB copy
from primary to replication system, I.e. initiat. So we do not have to
do any extra work to make them in sync.
Please tell if above will work as expected.
Thanks.