Dear All,
We have sucessfully upgrade our test (copy of our Production System) system ECC 6 to EHP6.
Now we are planning for upgrade our landscape i.e. DEV --> QAS -->PRD.
For emergency transport I have following confusion :
1. Temporary Development System for Emergency Development - will be a system copy of Development System. SID of both the system will be same or diff ?
2. In case of Temporary Development System, transport request from Temporary Development System sent to PRD and original development system. The transport request no. is in continuous number as original DEV. So after upgradation if I create Transport request in original DEV, will it create uniqueness problem?
3.. Can I create Temporary Development System for Emergency Development as stand alone system after copy from original Development. we will do development in Temporary Development and transfer Development request manully in DEV system as well as PRD system.
In our case emergency development load will be very very low during EHP upgrade process.
Which option is advisable?
Thanks and Regards,
Nirav