Dear Experts,
I am stuck in a strange issue and need your expert advise to help me out. Kindly advise.
My solman version is 7.1 SP 10 on Linux, and one of the concerned managed system is ABAP (ECC 6.0 EHP 6).
The issue is that when I navigate to Tx: Solman_workcenter-->Root Cause Analysis-->End-to-End Analysis-->Select a system and perform the "Workload Analysis", I see no data.
More strange is that, this issue is only appearing for ABAP systems, but data is completely visible for JAVA statck or Standalone JAVA managed systems. I have searched and tried to perform almost everything as per various OSS Notes and SCN posts, but no help.
Points which can help analysis:
1. All prior steps are error free and BI Cont is active.
2. There are data available in E2E_EFWK_STATUS and E2E_EFWK_STATUS, which means, workload data is getting populated correctly.
3. 0SMD_PE2H cube also contains correct data for the managed system, which means, workload data is getting populated correctly.
4. E2E EFWK HOUSEKEEPING and EFWK RESOURCE MANAGER jobs are running properly.
Thanks,
Avishek