Quantcast
Channel: SCN : All Content - SAP NetWeaver Administrator
Viewing all articles
Browse latest Browse all 5139

SUM tool 1.0SP14 stuck at end of CHECKS expecting new frontend

$
0
0

I am running the SUM tool 1.0 SP14 to apply ABAP support packs to a 7.40 system.  At end of CHECKS phase, I get just an informational box that Frontend should be upgraded.  There are no errors/warnings.  But when I want to continue to the PreProcessing phase, the CHECKS phase starts over again.

 

The error message on the monitor tab indicates "warning" occurred, but I see nothing else.

 

The tool is being run on the Windows 2012 host where the CI also resides. 

 

 

 

The CHECKS.LOG only shows:

 

===  Type: info  ===  Source: PREP_GENCHECKS/REQ_FRONTREQ_PRE  ===  Title: Update front end software  ===

 

 

 

 

*INFO* : The front end software could be updated at any time before or during

the upgrade. It must be updated before the start of the shadow instance in phase

*START_SHDI_FIRST* .

 

Refer to the upgrade manual if you do not know how to perform the update

procedure.

 

There are no errors in my SUM/abap/log directory.   What is it complianing about?

frontenderror.png

 

Screen Shot 2015-11-24 at 12.12.25 PM.pngScreen Shot 2015-11-24 at 12.12.29 PM.png


Viewing all articles
Browse latest Browse all 5139

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>