Hello,
I'm preparing the migration from ECC 6.0 EHP5 to EHP7 but I lost a lot of time with the IS_SELECT phase were addons versions are selected.
After pass this phase I get the next error in BIND_PATCH.
I do't know how to manage this error "Equivalence level not reached for IW_FNDGC". The different sp and attribute were extracted to /trans/EPS/in
How can I handle?
Regards