Quantcast
Channel: SCN : All Content - SAP NetWeaver Administrator
Viewing all articles
Browse latest Browse all 5139

Runtime Errors TSV_TNEW_PAGE_ALLOC_FAILED

$
0
0

Halo All,

 

I have seen so many threads regarding this error, but my problem is not resolved.

Here is the detailed description  of the error:

 

a.JPG

 

b.JPG

 

What can you do?

    Note which actions and input led to the error.

 

 

    For further help in handling the problem, contact your SAP administrator

    .

 

 

    You can use the ABAP dump analysis transaction ST22 to view and manage

    termination messages, in particular for long term reference.

 

 

    Try to find out (e.g. by targetted data selection) whether the

    transaction will run with less main memory.

 

 

    If there is a temporary bottleneck, execute the transaction again.

    -

 

 

    If the error persists, ask your system administrator to check the

    following profile parameters:

 

 

    o  ztta/roll_area            (1.000.000 - 15.000.000)

           Classic roll area per user and internal mode

           usual amount of roll area per user and internal mode

    o  ztta/roll_extension       (10.000.000 - 500.000.000)

           Amount of memory per user in extended memory (EM)

    o  abap/heap_area_total      (100.000.000 - 1.500.000.000)

           Amount of memory (malloc) for all users of an application

           server. If several background processes are running on

           one server, temporary bottlenecks may occur.

           Of course, the amount of memory (in bytes) must also be

           available on the machine (main memory or file system swap).

           Caution:

           The operating system must be set up so that there is also

           enough memory for each process. Usually, the maximum address

           space is too small.

           Ask your hardware manufacturer or your competence center

           about this.

           In this case, consult your hardware vendor

    abap/heap_area_dia:        (10.000.000 - 1.000.000.000)

           Restriction of memory allocated to the heap with malloc

           for each dialog process.

    Parameters for background processes:

    abap/heap_area_nondia:        (10.000.000 - 1.000.000.000)

           Restriction of memory allocated to the heap with malloc

           for each background process.

    Other memory-relevant parameters are:

    em/initial_size_MB:         (35-1200)

           Extended memory area from which all users of an

           application server can satisfy their memory requirement.

How to correct the error

    The amount of storage space (in bytes) filled at termination time was:

 

 

    Roll area...................... 6296480

    Extended memory (EM)........... 2002728224

    Assigned memory (HEAP)......... 1999159136

    Short area..................... " "

    Paging area.................... 32768

    Maximum address space.......... 18446604130054416399

 

 

    If the error occures in a non-modified SAP program, you may be able to

    find an interim solution in an SAP Note.

    If you have access to SAP Notes, carry out a search with the following

    keywords:

 

 

    "TSV_TNEW_PAGE_ALLOC_FAILED" " "

    "SAPF124" or "F124_MERGE"

    "XBSIS_XBSISGR_FUELLEN"

 

 

 

However I have increased the parameters defined above for dialog and non dialog both.

SAPTEMP tablespace is showing 0% used.

 

 

Kindly help me to solve the issue.

 

Thanks

Ankit Mishra


Viewing all articles
Browse latest Browse all 5139

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>