Hi All,
We are planning on introducing PO to our landscape and before we implement it, I want to make sure I have a solid SLD configuration.
I will post a drawing but I will add context to it here.
PO is NW 7.4
NWDI is NW 7.31
SOLMAN is NW 7.1 SP10
ERP is ECC 6 EHP 5
The SLD will be hosted on a dedicated AS Java instance. Same NW version as PO, 7.4
We also have Charm in the Landscape.
My goal is have a design time and runtime SLD. I do not want to sync the 2 SLD's. Charm requires the LMDB to sync to both SLD's.
I confirmed this can work: see figure 2: http://scn.sap.com/community/it-management/alm/blog/2013/01/10/sld-lmdb-topology-connections-valid-and-invalid-data-exchange-between-sld-and-lmdb-of-sap-solution-manager
This figure only shows 1 SOLMAN LMDB, not 2. I wonder if it makes a difference. My drawing has 2 SOLMANS.
Also for redundency of the SLD. How should I go about it?
Have a look at the diagram, give me your feedback. Sorry I have no visio.