We have an urgent issue in SAP CPS for tonight.
All the production systems are down, hence all the CPS queues & process servers are in "stopped" status at present.
Jobs are in "queue held" status for today.
As soon as systems are up and CPS starts running, immediately all the jobs will start running irrespective of the fact that the time scheduled for the job has been in the past.
For ex, even the job scheduled for 9:00 A.M, and the system is up at 9:00 PM, the job will start running right away.
Our client requirement is that only those jobs should run which are scheduled after the system time is up.
Say the system is up at 9:00 PM, jobs scheduled at 9 pm and after 9pm should run, not the ones before that timing.
So, indeed, the only option ahead of us is cancelling the rest of jobs manually as a single selection.
Is there any other way to perform this activity, like multiple job selections for cancellation? or any other opinion?