Dear Expert
I have query about the background job. Its BI System and having lot of jobs are scheduled hourly which are running always.
we down the system for the 2 hours or half of the day the job, the jobs are start in sequences which taking long times.
for e.g.; we down the system @ 9:55am for the 2 hour, the system back @ 11:10 am.
The system will process jobs of 10am then to 11am.
I don't want to process the past jobs, the system should wait for next schedule to run it.
Please advise how to do that ?
!
Regards