Quantcast
Channel: SCN : All Content - SAP NetWeaver Administrator
Viewing all articles
Browse latest Browse all 5139

Portal Upgrade of Customized Java Development Components from 7.01 to 7.31

$
0
0

Dear All,


We are upgrading our SAP NetWeaver Portal system from 7.01 to 7.31. In our Portal 7.01 system, we have development customized Java Webdypro Development components which are being used in Guided Procedure processes. Using the SUM tool, when we reach 'review The target release components list' step, we have two options against all the customized components i.e. Scan Inbox and Remove. When we select the "Scan Inbox" option, the step repeats and we see the same results without any change. And if we select the "Remove" option, we proceed to the next step. But we don't want to Remove any customized components in the upgrade process. We want to take all the customized components to 7.31 without any version change. We are not using NWDI system and non of or Portal system is under the control of NWDI.


After reading the following thread, we have found some clues. But we want a comprehensive study before the upgrade.

how to handle customized java packages during upgrade EHP2.NW7.0 to EHP1.NW7.3

In the above thread, user exported the required .SCA files from NWDI. In contrary, we don't have NWDI system. We developed and deployed all the customized components through NWDS installed in standalone PC.



Please guide us how to proceed with the step where target package level remain the same along with source.

Any suggestions please?


Thanks



Viewing all articles
Browse latest Browse all 5139

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>